Here is the revised text with terms that have 3 options in the format opt1:
* GDU 620 device * Power lead * Data wires
All connections are tight and not loose The device is properly adjusted and working correctly All precautionary measures have been implemented
Step 4: Configuring the GDU 620
Post-Installation Guide After completing the configuration, ensure that: